Feinder
Posts: 6589
Joined: 9/4/2002 From: Land o' Lakes, FL Status: offline
|
This is what I could come up with about Fletchers doing a quick Google search: These proposals did obviously not satisfy the General Board. Although several members proposed further studies of this and that proposed design, the General Board as a whole requested two weeks after the initial proposals had been made that a larger ship be studied, and four new proposals be drawn up. Once made, they drew heavily upon a number of proposals, from within C&R (where a flush-deck hull originated), to the General Board and the Bureau of Engineering. The final ship, which was to have five 5" guns, ten to twelve torpedo tubes, depth charges and K-guns to throw them with, plus most importantly, protection from heavy machine-gun fire in the form of 0.5" STS armor over vital spaces. This became some of the primary concern, since the added weight of the STS and the "parasitic" weight of a heavier and possibly wider hull to sustain the large weight of the armor increased tonnage immensely. When C&R finished the new proposals, they all came out over 2,000 tons. At the same time, the General Board accepted the need both for size and protection. In the final characteristics which the General Board gave out for the 1941 destroyer program, the new ships made good use of their large size: five 5" guns, ten torpedo tubes in quintuble mounts, a 28mm L/73 AA quad mount, four .50cal machine guns, 38 knots, four K-guns and two depth-charge racks, 0.5" STS protection for engines, boilers (both decks and sides), pilothouse and 0,75" STS over the 5" gun director. -F-
_____________________________
"It is obvious that you have greatly over-estimated my regard for your opinion." - Me 
|