Matrix Games Forums

Forums  Register  Login  Photo Gallery  Member List  Search  Calendars  FAQ 

My Profile  Inbox  Address Book  My Subscription  My Forums  Log Out

Axis production

 
View related threads: (in this forum | in all forums)

Logged in as: Guest
Users viewing this topic: none
  Printable Version
All Forums >> [New Releases from Matrix Games] >> Gary Grigsby's Eagle Day to Bombing the Reich >> Axis production Page: [1]
Login
Message << Older Topic   Newer Topic >>
Axis production - 1/23/2014 9:46:40 PM   
PizzaDeOveja


Posts: 52
Joined: 10/20/2011
Status: offline
Hi guys.
I just started my glorious Axis campaing and the first order of the day was of course researching ta-152H's like cracy.
Im guessing the factories with a delay of 8 mean they will be 8 days retooling before they can start researching and that 517 days, which is the higher number on any plant is the time, as of today, it will take to actualy start seeing some ta-152H rolling out of the plants (provided they are still there!)
Is that correct?




Attachment (1)

_____________________________


The Rules of War? I'll give you a lesson, sir, about the Rules of War...
Post #: 1
RE: Axis production - 1/24/2014 7:22:40 PM   
cohimbra


Posts: 632
Joined: 10/15/2011
From: Italy
Status: offline
Yes, you're right.

PS. the man in your signature is like Jean Alesi dressed by jockey!

< Message edited by cohimbra -- 1/24/2014 8:44:09 PM >

(in reply to PizzaDeOveja)
Post #: 2
RE: Axis production - 1/25/2014 9:13:01 AM   
PizzaDeOveja


Posts: 52
Joined: 10/20/2011
Status: offline
Haha...yes he does!

I decided to produce only fw 190A-5 and A-6 until my Ta's are ready but I dont think they are that good because they usually get pounded by the lame scorts allies have in '43 in '44 it will be hell!

_____________________________


The Rules of War? I'll give you a lesson, sir, about the Rules of War...

(in reply to cohimbra)
Post #: 3
RE: Axis production - 3/31/2014 1:29:59 PM   
Wijter

 

Posts: 30
Joined: 10/10/2013
Status: offline
Hi,

- you are right, a delay of 8 does mean the factory is out of service for 8 days, so no production or research.
- your assumption, that you will get the Ta-152 H after 517 days is not correct, you will get this factory after a delay of 517 days. After this it will contribute to research or production.

General: How long do I have to research, to get a machine that is scheduled for the future
Rule of thumb: The first month cost 100, the second 200, ..., the 8th and all >8 cost you 800 each)

Example:
+1 month - 100 machines researched (single engine w/o special rules: 100 frames AND 100 engines, a BV155 does require 4 engines/frame so you need 400 engines)
+2 month - 100 machines researched + 200 machines researched = 300 machines researched in total
...
+8 month - 100 machines researched = 100+200+300+400+500+600+700+800 = 3.600 machines researched total
> 8 month: Add 3.600 + n*800

Each research does require frames and engines, so to get a FW 190 A8 you need 1 frame and 1 engine, for a Me262 you need 1 frame and 4 engines.

Cheers,
Wijter

(in reply to PizzaDeOveja)
Post #: 4
Page:   [1]
All Forums >> [New Releases from Matrix Games] >> Gary Grigsby's Eagle Day to Bombing the Reich >> Axis production Page: [1]
Jump to:





New Messages No New Messages
Hot Topic w/ New Messages Hot Topic w/o New Messages
Locked w/ New Messages Locked w/o New Messages
 Post New Thread
 Reply to Message
 Post New Poll
 Submit Vote
 Delete My Own Post
 Delete My Own Thread
 Rate Posts


Forum Software © ASPPlayground.NET Advanced Edition 2.4.5 ANSI

0.750