Matrix Games Forums

Forums  Register  Login  Photo Gallery  Member List  Search  Calendars  FAQ 

My Profile  Inbox  Address Book  My Subscription  My Forums  Log Out

1.1.0 Thoughts on Gemini EOR Lunar Program

 
View related threads: (in this forum | in all forums)

Logged in as: Guest
Users viewing this topic: none
  Printable Version
All Forums >> [Current Games From Matrix.] >> [Modern] >> Buzz Aldrin's Space Program Manager >> 1.1.0 Thoughts on Gemini EOR Lunar Program Page: [1]
Login
Message << Older Topic   Newer Topic >>
1.1.0 Thoughts on Gemini EOR Lunar Program - 12/8/2014 5:15:47 AM   
stilicho410

 

Posts: 65
Joined: 4/16/2012
Status: offline
A couple of thoughts on this program:

1. Astronaut Fatalities: All or nothing.
After going through all the preliminary missions, tragedy struck when I attempted my first Lunar Landing mission.
After a successful landing and Lunar EVA, I had a catastrophic failure on Step 25, "Lunar Liftoff". Well, these things can always happen, but BOTH astronauts were declared dead. I would think that in this case, the astronaut in the lander would be doomed, but the other astronaut who remained in the Gemini spacecraft could still survive.

I realize that modifying this might require a change to the mission database design, as each mission step would have to define whether the entire crew or just some crew members were at risk. I understand if such an update is postponed for future expansions.

2. Gemini Lunar Landing EOR/LOR: Data Entry Error for Langley Light Lunar Lander?
Currently, spacecraft components of a Gemini Lunar Landing EOR/LOR are as follows (not counting spacesuits)

Booster "A" (Total 15200)
S-IVB Space Tug 15200 kg

Booster "B" (Total 28717)
Gemini Spacecraft: 3851 kg
Gemini EOR Service Module: 10064 kg
Langley Light Lunar Lander: 14696 kg
Spacesuits (a few more kg)

As currently defined, the only American rocket that can serve as Booster "B" is the Saturn V.
This rather defeats the purpose of EOR, which was to avoid the need to develop larger boosters.

I think there might have been a data entry error here, as the Langley Light lander weighs exactly the same (14696 kg) as the Apollo LEM!

If the Light Lander were closer in mass to the Gemini spacecraft (say around 3500 kg, it looks pretty small), then a Saturn 1B could serve as Booster "B".
This would make Gemini EOR an interesting choice in the game, as one would need to research more components, but would not need to build the final stage of the Vehicle Assembly Building or Saturn V.


_____________________________

Thanks,
Stilicho
Post #: 1
RE: 1.1.0 Thoughts on Gemini EOR Lunar Program - 12/8/2014 7:43:48 PM   
AndyW

 

Posts: 9
Joined: 7/14/2013
Status: offline
It's not quite that small.

I think for the N2O4/UDMH designs 3200->4600Kg was what I've seen.

The early LO2/LH2 designs are much lighter, maybe 1200->2000Kg, but that's not what the picture is of on the R+D screen...

_____________________________

AndyW

(in reply to stilicho410)
Post #: 2
RE: 1.1.0 Thoughts on Gemini EOR Lunar Program - 12/10/2014 4:35:41 AM   
stilicho410

 

Posts: 65
Joined: 4/16/2012
Status: offline
If the Light Lunar Lander were reduced in mass to say 4500 kg, then a Saturn 1B, with an LEO capacity of 18600 kg could serve as Booster "B".

Gemini Spacecraft: 3851 kg
Gemini EOR Service Module: 10064 kg
Langley Light Lunar Lander: 4500 kg
One Gemini EVA Suit: 15 kg
One Light Lunar EVA Suit: 91 kg
Total Payload 18521 kg

As it is, the current EOR configuration with its overweight lander doesn't make much sense. If a Saturn V is required as Booster B, why should you need Booster A to carry up an S-IVB? The Saturn V already has one.

In any case, the current mass of the light lander of 14696 kg is way off; that's the same mass as the Apollo LEM.


_____________________________

Thanks,
Stilicho

(in reply to AndyW)
Post #: 3
RE: 1.1.0 Thoughts on Gemini EOR Lunar Program - 12/10/2014 11:11:32 PM   
seydlitz_slith


Posts: 2036
Joined: 6/16/2002
From: Danville, IL
Status: offline

quote:

ORIGINAL: stilicho410

If the Light Lunar Lander were reduced in mass to say 4500 kg, then a Saturn 1B, with an LEO capacity of 18600 kg could serve as Booster "B".

Gemini Spacecraft: 3851 kg
Gemini EOR Service Module: 10064 kg
Langley Light Lunar Lander: 4500 kg
One Gemini EVA Suit: 15 kg
One Light Lunar EVA Suit: 91 kg
Total Payload 18521 kg

As it is, the current EOR configuration with its overweight lander doesn't make much sense. If a Saturn V is required as Booster B, why should you need Booster A to carry up an S-IVB? The Saturn V already has one.

In any case, the current mass of the light lander of 14696 kg is way off; that's the same mass as the Apollo LEM.


You might be on to something here about the light lander weight being too heavy. I also questioned how Gemini EOR was cheaper if I had to upgrade the VAB and build the Saturn V. That made the EOR both more expensive and more risky since there were more moving parts. Either the weight is wrong on the light lander or there should be a third rocket launch on the mission to carry part of the "stack" so you don't need Saturn V.

(in reply to stilicho410)
Post #: 4
RE: 1.1.0 Thoughts on Gemini EOR Lunar Program - 12/11/2014 10:47:47 AM   
N_Molson

 

Posts: 21
Joined: 6/13/2014
Status: offline
quote:

Langley Light Lunar Lander: 14696 kg


Hello,

I just checked the game data and indeed there is a bug. The mass of the Langley should be comparable to the Soviet LK (a bit heavier, because the LK uses the N1 Block D for powered descent). I'm forwarding this to the Lead Developer.

Thanks !

_____________________________

Nicolas Escats
Buzz Aldrin's Space Program Manager Contributor

(in reply to seydlitz_slith)
Post #: 5
RE: 1.1.0 Thoughts on Gemini EOR Lunar Program - 1/9/2015 11:45:14 AM   
Nacho84

 

Posts: 706
Joined: 2/7/2013
From: Brighton, UK
Status: offline

quote:

ORIGINAL: seydlitz


quote:

ORIGINAL: stilicho410

If the Light Lunar Lander were reduced in mass to say 4500 kg, then a Saturn 1B, with an LEO capacity of 18600 kg could serve as Booster "B".

Gemini Spacecraft: 3851 kg
Gemini EOR Service Module: 10064 kg
Langley Light Lunar Lander: 4500 kg
One Gemini EVA Suit: 15 kg
One Light Lunar EVA Suit: 91 kg
Total Payload 18521 kg

As it is, the current EOR configuration with its overweight lander doesn't make much sense. If a Saturn V is required as Booster B, why should you need Booster A to carry up an S-IVB? The Saturn V already has one.

In any case, the current mass of the light lander of 14696 kg is way off; that's the same mass as the Apollo LEM.


You might be on to something here about the light lander weight being too heavy. I also questioned how Gemini EOR was cheaper if I had to upgrade the VAB and build the Saturn V. That made the EOR both more expensive and more risky since there were more moving parts. Either the weight is wrong on the light lander or there should be a third rocket launch on the mission to carry part of the "stack" so you don't need Saturn V.


Hello seydlitz,

Indeed, the mass of the Light Lander was wrong (I created that row by copying and pasting the LEM and forgot to update the value!). This has been fixed, you'll get it in the next patch (SPM v. 1.2.0).

Cheers,

_____________________________

Ignacio Liverotti
Lead Developer of Buzz Aldrin's Space Program Manager
Polar Motion

www.polar-motion.com
spm.slitherine.com
Twitter: https://twitter.com/PolarMotion

(in reply to seydlitz_slith)
Post #: 6
Page:   [1]
All Forums >> [Current Games From Matrix.] >> [Modern] >> Buzz Aldrin's Space Program Manager >> 1.1.0 Thoughts on Gemini EOR Lunar Program Page: [1]
Jump to:





New Messages No New Messages
Hot Topic w/ New Messages Hot Topic w/o New Messages
Locked w/ New Messages Locked w/o New Messages
 Post New Thread
 Reply to Message
 Post New Poll
 Submit Vote
 Delete My Own Post
 Delete My Own Thread
 Rate Posts


Forum Software © ASPPlayground.NET Advanced Edition 2.4.5 ANSI

0.797