Marshall
Posts: 225
Joined: 4/18/2014 Status: offline
|
Hi there, I decided to drop in the issue I am contemplating for some time now. What is the fastest route to develop the : -N1K1-J George -A7M2 SAM My development for now, is developing the engines needed of course with 6 to 7 factories of 30 in size next to it, I develop the A6M5 Zero, then jump to the SAM. The George, i basically do the same, basically star ton the engine as much as possible entry to get as much time off as possible, so I can get have it operational in feb'43. Especially the SAM takes a lot of time, but is this route the fastest? how fast can i develop the sam, and what amount off effort would this take. Last but not least, Ki-49-IIb Helen vs the Ki-67-Ia Peggy. Is it worth moving to the Peggy? more range, but higher service rating, 30mph faster, but is it worth losing the payload? i think we should have a little Japanese aircraft discussion corner setup on this forum :) You can PM me if you don't want to share directly in the forum of course .
|