If I want to bring forward the available-to-build date of an aircraft to, say, 42/06 I can do that easily in the editor. But what happens if that aircraft has a device onboard that has an availability date that is later than 42/06? Can I still build it with that device without going into the editor and altering all devices for that aircraft?