Supply via sea to Riga? (Full Version)

All Forums >> [New Releases from Matrix Games] >> Gary Grigsby's War in the East Series



Message


Novaliz -> Supply via sea to Riga? (1/22/2020 7:25:27 PM)

I am playing the road to Leningrad scenario and I have captured Riga. Does Riga get supply via the sea? If so I would not have to repair all the rails to Riga and can start repairing rails from Riga, or not?




fritzfarlig -> RE: Supply via sea to Riga? (1/22/2020 8:30:40 PM)

How Much damage is the port the port is useless if to much damage

Remember the Baltic area rail network is more easy to repair




xhoel -> RE: Supply via sea to Riga? (1/22/2020 9:06:35 PM)

IIRC Riga only becomes operational once you get the ports of Kuressare (on the island of Saaremaa) and the port of Parnu. However like fritzfarlig said, rail repair in the Baltic is much quicker so your rail will probably reach Riga before the port becomes operational.

In the new patch, rail in ports no longer repairs automatically too, so you would be better served to just move your FBD in converting a track leading to Riga.




Ridgeway -> RE: Supply via sea to Riga? (1/23/2020 6:16:03 PM)

Also, IIRC, you cannot start a rail line from a port -- it has to be connected to the rest of the rail net.




Telemecus -> RE: Supply via sea to Riga? (1/24/2020 11:38:28 AM)


quote:

ORIGINAL: Ridgeway

Also, IIRC, you cannot start a rail line from a port -- it has to be connected to the rest of the rail net.


In v1.11.03 you can repair up to 7 hexes out from a port




Page: [1]

Valid CSS!




Forum Software © ASPPlayground.NET Advanced Edition 2.4.5 ANSI
1.017578