vallu751 -> [1.06.05] Private production pops are never unassigned (1/4/2021 7:38:30 PM)
|
Whenever I construct a public asset, the production cost in pop is used during construction and then worker count drops to upkeep count. For private assets, they never shake off the production pops. For example, a police station I has a production cost of 2000 pop and upkeep of 100 pop. After construction it sits steadily at 2,1K pop. Museum I at 1,1K pop and so forth. A Dome-Farm III hogs a whopping 39,2K pop.
|
|
|
|