[1.07.06] High speed rail station has 2 different machine costs (Full Version)

All Forums >> [New Releases from Matrix Games] >> Shadow Empire >> Tech Support



Message


Soar_Slitherine -> [1.07.06] High speed rail station has 2 different machine costs (2/4/2021 8:05:02 AM)

The high speed rail station is listed as costing both 20 machines and 5 machines per turn to construct in the asset details window. The actual amount consumed during construction seems to be 20 per turn, but misleadingly, the asset construction window lists the cost as only 5. This is from a savegame started in patch 1.07.03.


[image]local://upfiles/72195/B801E33A710246F7A6E727E30475CC1C.jpg[/image]




Vic -> RE: [1.07.06] High speed rail station has 2 different machine costs (2/4/2021 11:05:13 AM)

Will be fixed in the upcoming open beta. eta monday.
Thanks for spotting that one. It is indeed very misleading.




Page: [1]

Valid CSS!




Forum Software © ASPPlayground.NET Advanced Edition 2.4.5 ANSI
2.75