terry1040 -> Feature Request - Transfer of Air Units Calculation (6/18/2021 5:51:38 AM)
|
When transfering Air Units to another air base, the <CTRL>-Select Method calculates the projected support requirement for the target air base. If for exmaple you want to transfer all of KG77 to Gdynia Air base on Turn 1, the Pop-up indicates (182/200). The first number (182) represents the calculated support requirement (based on the aircraft*engines, Ju 88A = 2 eninges), the second number (200) represents the effective capacity based on the size of the target air base. Here is the problem: The calculated support requirement (182) is taking into account *ALL* aircraft (ready & damaged) within the to be transferred air units. But effectively only the ready aircraft will eventually be transferred (representing a calculated support requirement of 134 in the case of KG77). To me, this is misleading my judgement, if the target air base might be overstacked after the transfer. Can we please change the first number to be calculated only based on the ready units of the selected air units? [&o] Thanks Terry [image]local://upfiles/1548/A7BCD0F6313F4F979FF148D6F46F15A9.jpg[/image]
|
|
|
|