Fletcher
Posts: 3386
Joined: 10/26/2006 From: Jerez, Spain, EU Status: offline
|
quote:
quote: ORIGINAL: Fletcher AIRFRAMES PROD FIGURES MARCH 28TH, 1942 Hi Fletcher, I was very surprised your picture by the large number of airplanes that you are building: - 100 Nells - 90 Bettys - 83 Kates - 83 Vals How many planes are missing to month? Are not spending many HI to build that number of planes / engines? or are really needed so many planes of these types? many questions...... Hi Kriegmarine, good to see you here !. I am not loosing so much aircraft that I built monthly of course, but aircraft made = aircraft in the pool ready for reemplacement. I am spending as many HI as I planned to my engines/aircrafts. I think they are very needed (HI, engines, aircrafts). When I will have enough in my pool to stop my production, I will stop it awaiting for the next upgrade, then I will save many HIs, now and then I will have the aircrafts ready. When I upgrade production of this model of aircraft I will restart my production with a quick rate due my former figures of production from the former model. With factories without "free" upgrade, then I prefer to produce all needed airframes and then restart the production with a different and needed model. Best wishes, and thanks a lot for your post and question. Ramón
< Message edited by Fletcher -- 8/23/2010 7:35:42 PM >
_____________________________
WITP-AE, WITE
|