Maglio
Posts: 55
Joined: 1/16/2007 From: Chile Status: offline
|
I'm having similar problem, the upgrades are happening around 2 ½ months later as expected, I have stockpiled supplies on the bases above +30.000, I have in excess of 35.000 HI, upgrade, repair and production for the factories are all of them yes and I have in excess of 100 engines of the types required (the production of all other airframes using the same engine are off). Any ideas why it takes so long to upgrade to the next model? So far this has happened to Ki 57II, Nell G3M3, Ki48 IIa and Mavis H6K5.
_____________________________
“Tres barquichuelos dieron a los Reyes de España la posesión del Nuevo Mundo, estas cuatro tablas van a quitárselo”. Bernardo O' Higgins, October 10th, 1818, while watching the Chilean first fleet getting underway.
|