Hi all, quote:
ORIGINAL: USSAmerica House updates! Went over this past weekend (just getting a chance to upload the photos now) and found lots of progress in the past week! All of the electrical work appears to be completed and all switches, outlets, and light fixtures are installed both inside and outside. The ovens are installed in the kitchen and the last of the water faucets are installed. The tankless hot water heater is also installed. As near as I can tell, the last plumbing piece to be done is the toilet installation in the guest/upstairs bathroom. As you can see below, we also have our driveway and sidewalk in place! Nice Mike! Leo "Apollo11"