Local Yokel
Posts: 1494
Joined: 2/4/2007 From: Somerset, U.K. Status: offline
|
I've checked my ongoing PBEM game, which is Scenario 157: CHS 2.08 + Nik Mod. Should be the same as Scen. 158 save for absence of Soviet fleet. Results are as follows: Toyoda/Adv.Nakajima starts producing September 43, whilst N1K1 Shiden is *supposed* to start producing in August 43 - whoops! Slightly unfortunate, but tolerable, since the first Shiden reinforcement, F1/341st Hikotai, is not due to arrive until July 44. Nissan/Adv.Mitsubishi correctly started producing for me on 1 December 42, and already finding their way into the later recon. variant of the Ki-46 comand reconnaissance plane. Also required for the J2M Raiden. The first Raiden reinforcement group in this scenario is F1/301st Hikotai, due 15 November 43, though the aircraft normally starts production in March 43. If you can't get the Toyoda/Adv.Nakajima to produce at all, I would say that a much more serious consequence is the inability to produce the Type 4 Hayate (either version of Ki-84). Loss of the JAAF replacement for the Hien and the Shoki would be a game breaker for me, but inability to produce the Shiden or Shiden-Kai is nearly as bad. Oh yes, and you won't be able to replace Type 1 Firelighters with the P1Y Ginga, either. Is there another issue with the Type 4 Hayate? I note that the Ki-84-1a has a production run of 6 months before upgrading to Ki-84-1c, but for a slight performance reduction you get a substantial increase in firepower, so it looks like an upgrade worth having.
_____________________________
|