cfulbright
Posts: 2778
Joined: 5/7/2003 Status: offline
|
Dennis, This is what I posted on the testing forum just over two years ago: I don't understand the combination of production start and stop dates, combined with delayed availability for US fighters. For example, let's look at the P-51 in the 1943 Campaign (AAHQ) scenario: The P-51B-1 is produced Turns 1-9, but not available to deploy until Turn 10. A total of 192 are built, which will equip three US FB-F groups, but leaving no replacements available. The P-51B-10 is produced Turns 10-44, but not available to deploy until Turn 23, which means 13 turns go by in which not a single new P-51 enters the pool. A total of 1,378 are built. The P-51D is produced Turns 45 onward, but not available to deploy until Turn 53, by which time 372 are available, which means 9 turns go by in which not a single new P-51 enters the pool. So from Turn 9 to Turn 23, and again from Turn 44 to Turn 53, no new P-51's of any type are delivered to the pool. Cary
|