P-51 Production - 8/4/2020 10:48:49 AM   
The_Serious_Strategy_Gamer

 

Posts: 19
Joined: 7/11/2020
Status: offline
So esteemed Forumites, here is a question about P-51 production. I am playing the additional air HQ grand campaign, and I have advanced to September 1943 and I am not getting an P-51, although I am thinking that I should.

I have gotten a couple of P-51A (2 factories), but my understanding is that they should have been switched over to the production of the P-51B-1 (expansion rate 2, 24 limit) in June, and to the P-51B-10 in September (expansion rate 3, limit 36), alas I am not seeing any air frames in the pool, nor factories on the overview of the type.

What am I doing wrong?

Post #: 1
RE: P-51 Production - 8/4/2020 7:14:32 PM   
Denniss

 

Posts: 7902
Joined: 1/10/2002
From: Germany, Hannover (region)
Status: offline
P-51 will be produced until the end of September 1943 as defined in data.
There's actually a display bug not showing a proper end date for aircraft with update paths, factory upgrades will only happen past the end date of the current production model
Post #: 2
RE: P-51 Production - 8/5/2020 6:27:21 AM   
cfulbright

 

Posts: 2778
Joined: 5/7/2003
Status: offline
There is something I consider to be a bug in the game. You get P-51B-1's for a month or two, then production stops for a few months, then you get some P-51B-10's for a few months, then production again stops for a few months, then you start getting P-51D's until the end of the war.

I can't believe that's the way North American Aviation's production of P-51's actually worked, with no aircraft delivered for months at a time.

Cary
Post #: 3
RE: P-51 Production - 8/5/2020 9:46:45 AM   
The_Serious_Strategy_Gamer

 

Posts: 19
Joined: 7/11/2020
Status: offline
Hmm, so its purely a display bug? Let's see if I will start to get them in October then. Weird that the game has a bug pulling its own data.

(in reply to Denniss)
Post #: 4
RE: P-51 Production - 8/5/2020 9:43:32 PM   
Denniss

 

Posts: 7902
Joined: 1/10/2002
From: Germany, Hannover (region)
Status: offline
Check data in editor - many fighters have a date overlap with last production and first month of the successor. Old type will stay in production until they are past its last production date then switch to new model.
Post #: 5
RE: P-51 Production - 8/5/2020 11:33:56 PM   
cfulbright

 

Posts: 2778
Joined: 5/7/2003
Status: offline
Dennis,

This is what I posted on the testing forum just over two years ago:

I don't understand the combination of production start and stop dates, combined with delayed availability for US fighters.

For example, let's look at the P-51 in the 1943 Campaign (AAHQ) scenario:

The P-51B-1 is produced Turns 1-9, but not available to deploy until Turn 10. A total of 192 are built, which will equip three US FB-F groups, but leaving no replacements available.

The P-51B-10 is produced Turns 10-44, but not available to deploy until Turn 23, which means 13 turns go by in which not a single new P-51 enters the pool. A total of 1,378 are built.

The P-51D is produced Turns 45 onward, but not available to deploy until Turn 53, by which time 372 are available, which means 9 turns go by in which not a single new P-51 enters the pool.

So from Turn 9 to Turn 23, and again from Turn 44 to Turn 53, no new P-51's of any type are delivered to the pool.

Cary

(in reply to Denniss)
Post #: 6
RE: P-51 Production - 8/6/2020 8:07:25 PM   
Denniss

 

Posts: 7902
Joined: 1/10/2002
From: Germany, Hannover (region)
Status: offline
B-1 is produced until 11/43, B-10 until 5/44.
You need to look at the true dates in the editor, not the borked display in the production menu which does not show end dates

(in reply to cfulbright)
Post #: 7
RE: P-51 Production - 8/15/2020 12:14:22 PM   
The_Serious_Strategy_Gamer

 

Posts: 19
Joined: 7/11/2020
Status: offline
So looking at the editor the B-1 would start to be produced in 1943 June.

However it is now 1943 September 11 and I have no P-51B-1 is the pool per the production view (the type does not even show up, with or without filters) and I can not select it when changing the airplane type of a US FB group. Only the P-51A shows up at all (as an outdated plane in the production view with #- and with like 6 aircraft in the pool)

I dont get it

EDIT: Ok, per the editor the P-51A is produced until 1943 September, so I guess that is what is preventing the B-1 to show up. I wonder whether it get produced in the background or not at all though.

< Message edited by The_Serious_Strategy_Gamer -- 8/15/2020 1:25:09 PM >

(in reply to Denniss)
Post #: 8
Page:   [1]
All Forums >> [New Releases from Matrix Games] >> Gary Grigsby's War in the West >> P-51 Production Page: [1]
Jump to:





New Messages No New Messages
Hot Topic w/ New Messages Hot Topic w/o New Messages
Locked w/ New Messages Locked w/o New Messages
 Post New Thread
 Reply to Message
 Post New Poll
 Submit Vote
 Delete My Own Post
 Delete My Own Thread
 Rate Posts


Forum Software © ASPPlayground.NET Advanced Edition 2.4.5 ANSI

0.734