obvert
Posts: 14050
Joined: 1/17/2011 From: PDX (and now) London, UK Status: offline
|
quote:
ORIGINAL: fcharton Hi Erik There's a glitch in your 1945 figures, you reported the reinforcements for 44 (893) instead of those for 45 (1676), the total is correct, though. quote:
ORIGINAL: obvert Also, Alfred mentions that some groups don't come with complete TOE for the Allies? I had thought the arriving groups were complete, unlike the Japanese where they routinely come with 2 planes. I'd like to get the details more or less correct, but now also get up some estimates for the Japanese side, which will come in the next day. I think you have the figures in Tracker plane production tab: under the TBO.YTA column, you two figures : the total number of planes, and the number you need to build, the difference is the number of planes that arrive as reinforcements throughout the game. For instance, in scen 2, the british avenger II are 0 (12), which mean the twelve of them arrive as reinforcements. In my opinion, there is no need to take withdrawing squadrons into account. The point of this analysis is to show what kind of losses the Allies can sustain before having to cut operations down. If you reach that level, as the allies, your squadrons will withdraw empty anyway. Francois Thanks. I'll correct that. The first was without the Soviets I think and I didn't change the top number. Yeah, all of this has been done without tracker so far as I just wanted to dig through the groups first and do it manually. Kind of let me get a feel for it. I also have more trouble 'seeing' the details in tracker, simply due to the visuals. I don't do as well with things that look like spreadsheets. I'll check it out though as I continue.
_____________________________
"Success is the ability to go from one failure to another with no loss of enthusiasm." - Winston Churchill
|